Residential New Project

MY HOME TRIDASA

MY HOME INFRASTRUCTURES PVT LTD
MANMOLE, MANMOLE, Madhapur, RC PURAM, Sangareddy, PIN: 500075

Project Information

Project Name
MY HOME TRIDASA
Project Type
Residential
Project Status
New Project
Authority Name
GHMC
Plan Approval No.
1/C22/02745/2020
Proposed Completion
31 Dec 2024
Last Modified
29 Mar 2023

Promoter Information

Promoter Name
MY HOME INFRASTRUCTURES PVT LTD
Promoter Type
Individual
Address
H NO 1-123 8TH FLOOR 3RD BLOCK, MY HOME HUB, HITECH CITY ROAD, NEAR CYBER TOWERS

Land Details

Total Area
91,306.48
sq.m (982,823 sq.ft)
Net Area
91,306.48
sq.m (982,823 sq.ft)
Approved Built-up
400,895.85
sq.m (4,315,243 sq.ft)
Mortgage Area
60,134.38 sq.m
Total Building Units
9
Proposed Units
9

Property Boundaries

North
RAILWAY TRACK
South
30M WIDE ROAD
East
NEIGHBOURS LAND
West
NEIGHBOURS LAND

Uploaded Documents 86

Legal Title Copy of the legal title report
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Legal Title Land Title Search Report from an advocate having experience of at least 10 years
Document Incase these documents are under preparation at time of registration, please ...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Resolution Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Building Permit Commencement Certificates for each building in each phase
Declaration Declaration in FORM B
Declaration Declaration in FORM B
Declaration Declaration in FORM B
Legal Entity Status of Formation of Legal Entity
Completion Form–1A Architects certificate Overall completion of registered project
Completion Form–1A Architects certificate Overall completion of registered project
Completion Form–1A Architects certificate Overall completion of registered project
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) 4505 - -

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums
100%
4 Stilt Floor -
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
100%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
100%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
100%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
100%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
100%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
90%

Bank Details

Bank Name
ICICI BANK
Account Number
********6022
Branch
KONDAPUR
Ifsc
ICIC0000040

Professional Information

Professional Name
T. VISHNU VARDHAN
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
Kasiviswanath Sadasivuni
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Declaration in FORM B View -

Location

District
Mandal
RC PURAM
Village
Madhapur
Locality
MANMOLE
Street
MANMOLE
PIN Code
500075

Registration Status

86 Documents Uploaded
Full Details Available

More by MY HOME INFRASTRUCTU...

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis