Residential New Project

MY HOME ANKURA

MY HOME INFRASTRUCTURES PVT LTD
NEAR ICRISAT, TELLAPUR AND MANMOLE, TELAPUR, RC PURAM, Sangareddy, PIN: 502032

Project Information

Project Name
MY HOME ANKURA
Project Type
Residential
Project Status
New Project
Authority Name
HMDA
Proposed Completion
17 Dec 2024
Last Modified
29 Mar 2023

Promoter Information

Promoter Name
MY HOME INFRASTRUCTURES PVT LTD
Promoter Type
Individual
Address
H NO 1-123 8TH FLOOR 3RD BLOCK, MY HOME HUB, HITECH CITY ROAD, NEAR CYBER TOWERS

Land Details

Survey No.
206 to 215 & 238 to 243/P and 476/P and 477/P
Total Area
305,382.48
sq.m (3,287,137 sq.ft)
Net Area
305,382.48
sq.m (3,287,137 sq.ft)
Approved Built-up
203,307.00
sq.m (2,188,397 sq.ft)
Mortgage Area
9,072.81 sq.m
Total Building Units
603
Proposed Units
603

Property Boundaries

North
241 242 and 238
South
206 209 and 210
East
238 237 214 and 215
West
477 and Shilpa Dream Valley

Uploaded Documents 66

Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Legal Entity Status of Formation of Legal Entity
Building Permit Commencement Certificates for each building in each phase
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Conveyance Status of Conveyance
Conveyance Status of Conveyance
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Declaration Declaration in FORM B
Declaration Declaration in FORM B
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Legal Title Land Title Search Report from an advocate having experience of at least 10 years
Legal Title Land Title Search Report from an advocate having experience of at least 10 years
Legal Title Land Title Search Report from an advocate having experience of at least 10 years
Resolution Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Completion Form–1A Architects certificate Overall completion of registered project
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) - - -

Promoter / Land Owner / Investor Details 23

Name Type Agreement
K Venkat Reddy Individual AreaShare
P.Shobha Rani Individual AreaShare
M. Shankar Reddy Individual AreaShare
M.PADMAVATHI Individual AreaShare
M SRINIVAS REDDY Individual AreaShare
VENKATESH Individual AreaShare
K AGAM REDDY Individual AreaShare
RAJI REDDY Individual AreaShare
NARENDAR REDDY Individual AreaShare
SURENDER REDDY Individual AreaShare
BALAWANTH REDDY Individual AreaShare
VIJAY KUMAR Individual AreaShare
MADHAVI Individual AreaShare
UMA Individual AreaShare
SUSURTUTHA Individual AreaShare
YELLAMMA Individual AreaShare
NARSIMULU Individual AreaShare
KUMAR GOUD Individual AreaShare
JAGADEESHWAR Individual AreaShare
ANANTH REDDY Individual AreaShare
M.VIJAY BHASKER REDDY Individual AreaShare
VIJAYA CHANDER Individual AreaShare
SHASHIVARDHAN rao Company AreaShare

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums -
4 Stilt Floor -
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
100%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
100%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. -
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
100%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
100%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
70%

Bank Details

Bank Name
ICICI BANK LIMITED
Account Number
********9080
Branch
KONDAPUR
Ifsc
ICIC0000040

Professional Information

Professional Name
T BYRAGI NAIDU
Telanganarera Certificate No
NA
Professional Type
Structural Engineer
Professional Name
G. TRIMURTHY
Telanganarera Certificate No
NA
Professional Type
Architect

Common Areas & Facilities

Facility / Amenity Available Details
Copy of Approval Layout Plan View -
Copy of Approval Layout Plan View -
Proforma of the allotment letter and agreement for sale View -
Declaration in FORM B View -

Location

District
Mandal
RC PURAM
Village
TELAPUR
Locality
NEAR ICRISAT
Street
TELLAPUR AND MANMOLE
PIN Code
502032

Registration Status

66 Documents Uploaded
Full Details Available

More by MY HOME INFRASTRUCTU...

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.