Residential New Project

VEDANTA TOWERS

VEDANTA CONSTRUCTIONS
Mettakanigudem, Near Modi Splendour, Gajula Ramaram-1, Qutballapur, Medchal-Malkajgiri, PIN: 500015

Project Information

Project Name
VEDANTA TOWERS
Project Type
Residential
Project Status
New Project
Authority Name
GHMC
Plan Approval No.
1/C26/00315/2022
Proposed Completion
16 Apr 2028
Last Modified
20 Sep 2022

Promoter Information

Promoter Name
VEDANTA CONSTRUCTIONS
Promoter Type
Individual
Address
FLAT NO 401, COMFORT CASTLE, MAIN ROAD, ABOVE SBI

Land Details

Survey No.
155
Plot No.
OPEN LAND
Total Area
5,730.93
sq.m (61,688 sq.ft)
Net Area
4,985.59
sq.m (53,665 sq.ft)
Approved Built-up
1,245.48
sq.m (13,406 sq.ft)
Road Widening Area
745.33 sq.m
Mortgage Area
1,301.03 sq.m
Total Building Units
4
Proposed Units
3

Property Boundaries

North
30 FEET WIDE ROAD
South
LAND BELONGS TO K NARASIMHA REDDY AND OTHERS
East
30 FEET WIDE ROAD
West
LAND BELONGS TO G LAKSHMAIAH ANDP LATHA

Uploaded Documents 23

These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) 115 - 10%

Promoter / Land Owner / Investor Details 3

Name Type Agreement
PARUSHA MALLESH YADAV Individual AreaShare
PARUSHA ASHOK YADAV Individual AreaShare
PARUSHA YADAGIRI YADAV Individual AreaShare

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums -
4 Stilt Floor -
5 X number of Slabs of Super Structure -
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises -
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises -
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. -
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing -
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate -
11 Overall Percentage of Completion of the work done For the entire Building /Wing
20%

Bank Details

Bank Name
STATE BANK OF INDIA
Account Number
*******5748
Branch
KPHB COLONY
Ifsc
SBIN0010098

Professional Information

Professional Name
K PRASANNA KUMARI
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
THOTA CHAKRAPANI
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Copy of the legal title report View -
Copy of the legal title report View -
Copy of the legal title report View -
Copy of the legal title report View -
Details of encumbrances View -
Proforma of the allotment letter and agreement for sale View -
Proforma of the allotment letter and agreement for sale View -
Declaration in FORM B View -
Copy of Sanctioned Building Plan View -
Copy of Board Resolution for appointment of Authorized Signatory in case of other than individual View -

Location

Mandal
Qutballapur
Village
Gajula Ramaram-1
Locality
Mettakanigudem
Street
Near Modi Splendour
PIN Code
500015

Registration Status

23 Documents Uploaded
Full Details Available

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.