Project Information

Project Name
VASAVI METROPOLIS
Project Type
Residential
Project Status
New Project
Authority Name
HMDA
Plan Approval No.
038673/GHT/R1/U6/HMD
Proposed Completion
17 Apr 2027
Last Modified
30 May 2025

Promoter Information

Promoter Name
OUR HOME REALTORS LLP
Promoter Type
Individual
Address
8-3-833/K/1, FLAT NO 409, KRISHE MEADOWS, MAIN ROAD

Land Details

Survey No.
389/P, 390, 391/P, 392 to 394, 395/P, 400/P, 402 to 414, 416, 417, 420 to 428 and 429
Plot No.
20, 21, 24 AND 25
Total Area
8,799.98
sq.m (94,723 sq.ft)
Net Area
8,799.98
sq.m (94,723 sq.ft)
Approved Built-up
42,704.60
sq.m (459,672 sq.ft)
Mortgage Area
6,405.66 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
PLOT NO 22 AND 23
South
PLOT NO 19 AND 26
East
ROAD WIDTH 18
West
ROAD WIDTH 30

Uploaded Documents 25

Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Declaration Declaration in FORM B
Building Permit Commencement Certificates for each building in each phase
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Resolution Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Encumbrance Details of encumbrances
Building Permit Commencement Certificates for each building in each phase
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Completion Form–1A Architects certificate Overall completion of registered project
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) 400 - -

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums -
4 Stilt Floor
100%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
95%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
85%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
98%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
100%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
95%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
87.3%

Bank Details

Bank Name
INDUSIND BANK
Account Number
********1973
Branch
BEGUMPET
Ifsc
INDB0000004

Professional Information

Professional Name
Venu Associates
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
M Laxmana Chary
Telanganarera Certificate No
NA
Professional Type
Structural Engineer
Professional Name
VISHEWANTHAM BALA BHARGAVI
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
NARAYANADAS VAMSHI KRISHNA
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : YES COMPLETED
Water Supply : YES WORK IN PROGRESS
Sewerage (Chamber, Lines, Septic Tank , STP) : YES WORK IN PROGRESS
Storm Water Drains : YES WORK IN PROGRESS
Green Strip/TOT LOT/Park : YES COMPLETED
Street Lighting : YES WORK IN PROGRESS
Community Buildings : YES WORK IN PROGRESS
Treatment And Disposal Of Sewage And Sullage Water : YES WORK IN PROGRESS
Solid Waste Management And Disposal : YES WORK IN PROGRESS
Water Conservation, Rain water Harvesting : YES COMPLETED
Energy management : YES WORK IN PROGRESS
Fire Protection And Fire Safety Requirements : YES WORK IN PROGRESS
Electrical Meter Room, Sub-Station, Receiving Station : YES WORK IN PROGRESS
Aggregate area of recreational Open Space : No NA

Location

Mandal
Uppal
Village
Uppal
Locality
UPPAL BHAGAT VILLAGE
Street
UPPAL BHAGAT VILLAGE
PIN Code
500039

Registration Status

25 Documents Uploaded
Full Details Available

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.