Residential

THE ELITE ENCLAVE

JAYA CONSTRUCTIONS
GANDIPET MANDAL, TIRUMALA GARDENS, BANDLAGUDA JAGIR MUNICIPAL CORPORATION, Bandlaguda, Gandipet, Ranga Reddy, PIN: 500089

Project Information

Project Name
THE ELITE ENCLAVE
Project Type
Residential
Authority Name
HMDA
Proposed Completion
14 Jun 2029
Last Modified
13 Apr 2024

Promoter Information

Promoter Name
JAYA CONSTRUCTIONS
Promoter Type
Individual
Address
H NO 2-2-185/24/H, JAYA CONSTRUCTIONS, MALLIKARJUN NAGAR, MALLIKARJUN NAGAR

Land Details

Survey No.
SY NOs 2, 4, 5, 6, 7 AND 8
Plot No.
PLOT NOs 61 AND 60 NORTHERN PART
Total Area
334.34
sq.m (3,599 sq.ft)
Net Area
334.34
sq.m (3,599 sq.ft)
Approved Built-up
948.85
sq.m (10,213 sq.ft)
Mortgage Area
99.18 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
PLOT NO 62
South
PLOT NO 60 SOUTHERN PART
East
PLOT NOs 52 AND 53
West
30 FEET WIDE ROAD

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) 185 - 90%
Covered Parking ( In Numbers) 10 - 90%

Promoter / Land Owner / Investor Details 3

Name Type Agreement
VULUPALA PRITHVI Individual AreaShare
NARAHARISHETTI MANOJ Individual AreaShare
VEERAMPETA NARESH KUMAR REDDY Individual AreaShare

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth -
3 X number of Podiums -
4 Stilt Floor
90%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
70%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
70%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
70%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
70%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
70%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
64%

Bank Details

Bank Name
ICICI BANK
Account Number
********0827
Branch
SHIVAM ROAD BRANCH
Ifsc
ICIC0002362

Professional Information

Professional Name
VENU CHANDRAGIRI
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
CHERUBIM ENGINEERS ASSOCIATES MR SAMUEL
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : No NA
Water Supply : YES HMWSSB
Sewerage (Chamber, Lines, Septic Tank , STP) : YES HMWSSB
Storm Water Drains : No NA
Green Strip/TOT LOT/Park : YES GREEN STRIPS ALL ALONG THE SITE
Street Lighting : No NA
Community Buildings : No NA
Treatment And Disposal Of Sewage And Sullage Water : No NA
Solid Waste Management And Disposal : No NA
Water Conservation, Rain water Harvesting : YES RWH PITS
Energy management : No NA
Fire Protection And Fire Safety Requirements : No NA
Electrical Meter Room, Sub-Station, Receiving Station : YES TSSPDCL
Aggregate area of recreational Open Space : No NA

Location

District
Mandal
Gandipet
Village
Bandlaguda
Locality
GANDIPET MANDAL
Street
TIRUMALA GARDENS, BANDLAGUDA JAGIR MUNICIPAL CORPORATION
PIN Code
500089

Registration Status

18 Documents Uploaded
Full Details Available

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.