Residential New Project

SRI OM TOWERS

SRI OM BUILDERS
DEVANPALLY, DEVANPALLY, Kamareddy, Kamareddy, PIN: 503111

Project Information

Project Name
SRI OM TOWERS
Project Type
Residential
Project Status
New Project
Authority Name
DTCP
Proposed Completion
27 Oct 2024
Last Modified
12 Feb 2024

Promoter Information

Promoter Name
SRI OM BUILDERS
Promoter Type
Individual
Address
H NO 5-59/31 PLOT NO-86, SWARNADHAMA NAGAR MILITARY FARM ROAD, OLD BOWENPALLY, BALANAGAR

Land Details

Survey No.
227/2B NEW 227/2A OLD
Plot No.
OPEN LAND
Total Area
2,157.86
sq.m (23,227 sq.ft)
Net Area
2,019.81
sq.m (21,741 sq.ft)
Approved Built-up
6,426.24
sq.m (69,172 sq.ft)
Road Widening Area
138.05 sq.m
Mortgage Area
655.53 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
ROAD
South
OPEN LAND OF NEIGHBOURS
East
ROAD
West
ROAD

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) 40 - -

Promoter / Land Owner / Investor Details 1

Name Type Agreement
OM PRAKASH Individual AreaShare,RevenueShare

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums -
4 Stilt Floor
100%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
100%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
100%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
100%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
100%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
100%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
90%

Bank Details

Bank Name
BANK OF BARODA
Account Number
**********1158
Branch
BOINPALLY- SECUNDERABAD
Ifsc
BARB0BOINPA

Professional Information

Professional Name
A ANBARASAN
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
ASWANI NANDA KUMAR
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : YES COMPLETED
Water Supply : YES COMPLETED
Sewerage (Chamber, Lines, Septic Tank , STP) : YES COMPLETD
Storm Water Drains : No NA
Green Strip/TOT LOT/Park : YES COMPLETED
Street Lighting : YES COMPLETED
Community Buildings : No NA
Treatment And Disposal Of Sewage And Sullage Water : No NA
Solid Waste Management And Disposal : No NA
Water Conservation, Rain water Harvesting : No NA
Energy management : No NA
Fire Protection And Fire Safety Requirements : YES COMPLETED
Electrical Meter Room, Sub-Station, Receiving Station : YES COMPLETED
Aggregate area of recreational Open Space : YES COMPLETED

Location

District
Mandal
Kamareddy
Locality
DEVANPALLY
Street
DEVANPALLY
PIN Code
503111

Registration Status

12 Documents Uploaded
Full Details Available

More by SRI OM BUILDERS

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.