Residential
New Project
SLVC RESIDENCY
BARLA PAVANKUMAR REDDY
CHRISTIANPALLAY, CHRISTIANPALLY REVENUE WARD, Chrstianpally, Mahabubnagar Urban, Mahabubnagar, PIN: 509001
Project Information
Project Name
SLVC RESIDENCY
Project Type
Residential
Project Status
New Project
Authority Name
DTCP
Plan Approval No.
0028/BP/3063/2021
Proposed Completion
01 Dec 2024
Last Modified
20 Aug 2022
Promoter Information
Promoter Name
BARLA PAVANKUMAR REDDY
First Name
BARLA
Last Name
PAVANKUMAR REDDY
Father's Name
RAMI REDDY BARLA
Promoter Type
Individual
Contact
08501857469
Address
ANAND NAGAR COLONY, BEHIND BALAJI APPARTMENTS
Land Details
Survey No.
SY NO 465,465/A,465/AA,465/E
Plot No.
PLOT NO 1,2,3,4,5
Total Area
1,415.92
sq.m (15,241 sq.ft)
Net Area
1,415.92
sq.m (15,241 sq.ft)
Approved Built-up
3,861.44
sq.m (41,565 sq.ft)
Mortgage Area
337.39 sq.m
Total Building Units
1
Proposed Units
1
Property Boundaries
North
OTHERS LAND
South
OTHERS LAND
East
OTHERS LAND
West
OTHERS LAND
Uploaded Documents 9
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Land Title Search Report from an advocate having experience of at least 10 years
Encumbrance
Details of encumbrances
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Building Permit
Commencement Certificates for each building in each phase
Building Plan
Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Document
Incase these documents are under preparation at time of registration, please ...
Declaration
Declaration in FORM B
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.
Project Details
| Item | Proposed | Booked | Work Done (%) |
|---|---|---|---|
| Open Parking (In sqmts) | - | - | - |
| Covered Parking ( In Numbers) | 12 | - | - |
Construction Progress
| # | Activity | Progress |
|---|---|---|
| 1 | Excavation | - |
| 2 | X number of Basement(s) and Plinth | - |
| 3 | X number of Podiums | - |
| 4 | Stilt Floor | - |
| 5 | X number of Slabs of Super Structure | - |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | - |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | - |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | - |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | - |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | - |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing | - |
Bank Details
Bank Name
BANK OF BARODA
Account Number
**********0545
Branch
JUBILEE HILLS
Ifsc
BARB0JUBILE
Professional Information
Professional Name
A ANBARASAN
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
ASWANI NANDA KUMAR
Telanganarera Certificate No
NA
Professional Type
Structural Engineer
Common Areas & Facilities
| Facility / Amenity | Available | Details |
|---|---|---|
| Internal Roads & Footpaths : | YES | YET TO START |
| Water Supply : | YES | YET TO START |
| Sewerage (Chamber, Lines, Septic Tank , STP) : | YES | YET TO START |
| Storm Water Drains : | No | NA |
| Green Strip/TOT LOT/Park : | YES | YET TO START |
| Street Lighting : | YES | YET TO START |
| Community Buildings : | No | NA |
| Treatment And Disposal Of Sewage And Sullage Water : | No | NA |
| Solid Waste Management And Disposal : | No | NA |
| Water Conservation, Rain water Harvesting : | No | NA |
| Energy management : | No | NA |
| Fire Protection And Fire Safety Requirements : | No | NA |
| Electrical Meter Room, Sub-Station, Receiving Station : | YES | YET TO START |
| Aggregate area of recreational Open Space : | YES | YET TO START |
Location
District
Mandal
Mahabubnagar Urban
Village
Chrstianpally
Locality
CHRISTIANPALLAY
Street
CHRISTIANPALLY REVENUE WARD
PIN Code
509001
Registration Status
9 Documents Uploaded
Full Details Available
Need Complete Property Verification?
Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place
Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now
✨ Get comprehensive property verification in minutes