Residential
VIYA VENTURES
VIYA VENTURES
HARIDASPALLE, SINDHUVANAM, Haridaspalle, Keesara, Medchal-Malkajgiri, PIN: 501301
REA02200024190
Project Information
Project Name
VIYA VENTURES
Registration No.
REA02200024190
Application No.
P02200002422
Project Type
Residential
Authority Name
HMDA
Plan Approval No.
034423/GHT/R1/U6/HMD
Proposed Completion
30 Sep 2022
Last Modified
11 Sep 2023
Promoter Information
Promoter Name
VIYA VENTURES
Promoter Type
Individual
Address
SY.NO, SY.NO 371/409/P, RENUKA YELLAMMA TEMPLE, OPP.RENUKA YELLAMMA TEMPLE
Land Details
Survey No.
51/P TO 59/P
Plot No.
529 & 530
Total Area
879.60
sq.m (9,468 sq.ft)
Net Area
879.60
sq.m (9,468 sq.ft)
Approved Built-up
1,933.10
sq.m (20,808 sq.ft)
Road Widening Area
0.00 sq.m
Mortgage Area
205.33 sq.m
Total Building Units
1
Proposed Units
1
Property Boundaries
North
60 FEET WIDE ROAD
South
AHEMAD GUDA VILLAGE BOUNDARY
East
SOCIAL INFRA AREA
West
33 FEET WIDE ROAD
Uploaded Documents 30
Legal Title
Copy of the legal title report
Encumbrance
Details of encumbrances
Encumbrance
Details of encumbrances
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Declaration
Declaration in FORM B
Building Permit
Commencement Certificates for each building in each phase
Building Permit
Commencement Certificates for each building in each phase
Building Permit
Commencement Certificates for each building in each phase
Building Plan
Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Resolution
Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Legal Title
Land Title Search Report from an advocate having experience of at least 10 years
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Document
Incase these documents are under preparation at time of registration, please ...
Document
Incase these documents are under preparation at time of registration, please ...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.
Project Details
| Item | Proposed | Booked | Work Done (%) |
|---|---|---|---|
| Open Parking (In sqmts) | 837 | - | 100% |
| Covered Parking ( In Numbers) | 35 | - | 100% |
Construction Progress
| # | Activity | Progress |
|---|---|---|
| 1 | Excavation |
|
| 2 | X number of Basement(s) and Plinth | - |
| 3 | X number of Podiums | - |
| 4 | Stilt Floor |
|
| 5 | X number of Slabs of Super Structure |
|
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
|
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
|
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
|
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
|
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
|
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing |
|
Bank Details
Bank Name
HDFC BANK LTD
Account Number
**********9202
Branch
KAPRA CIRCLE
Ifsc
HDFC0009611
Professional Information
Professional Name
G VENKATESH
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
MADAV RAO
Telanganarera Certificate No
NA
Professional Type
Structural Engineer
Common Areas & Facilities
| Facility / Amenity | Available | Details |
|---|---|---|
| Copy of the legal title report | View | - |
| Copy of the legal title report | View | - |
| Copy of the legal title report | View | - |
| Copy of the legal title report | View | - |
| Copy of the legal title report | View | - |
| Copy of the legal title report | View | - |
| Copy of Approval Layout Plan | View | - |
| Copy of Approval Layout Plan | View | - |
| Proforma of the allotment letter and agreement for sale | View | - |
Location
District
Mandal
Keesara
Village
Haridaspalle
Locality
HARIDASPALLE
Street
SINDHUVANAM
PIN Code
501301
Registration Status
30 Documents Uploaded
Full Details Available
More by VIYA VENTURES
Need Complete Property Verification?
Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place
Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now
✨ Get comprehensive property verification in minutes