Residential New Project

HILIFE SUNRISE

HILIFEINFRASTRUCTURES
HAL COLONY, ROAD NO 11, Olb Bowenpally, Balanagar, Medchal-Malkajgiri, PIN: 500011
REA02200001925

Project Information

Project Name
HILIFE SUNRISE
Registration No.
REA02200001925
Application No.
P02200001238
Project Type
Residential
Project Status
New Project
Authority Name
GHMC
Proposed Completion
05 Feb 2025
Last Modified
25 Sep 2019

Promoter Information

Promoter Name
HILIFEINFRASTRUCTURES
Promoter Type
Individual
Address
8-5-213/7, HILIFE INFRASTRUCTURES, SAI KRISHNA COLONY, NEAR SYNDICATE BANK COLONY

Land Details

Survey No.
8,39 & 40
Plot No.
26&27
Total Area
733.80
sq.m (7,899 sq.ft)
Net Area
733.80
sq.m (7,899 sq.ft)
Approved Built-up
1,973.80
sq.m (21,246 sq.ft)
Mortgage Area
197.38 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
PLOT NO 25A 25B
South
40 FEET ROAD
East
PLOT NO 22 23
West
PLOT NO 28 29

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) 20 - -

Promoter / Land Owner / Investor Details 3

Name Type Agreement
CHINTAPALLY MONISHA RANI Individual AreaShare
M SARVOTHAMA REDDY Individual AreaShare
M SUPRIYA Individual AreaShare

Construction Progress

# Activity Progress
1 Excavation
75%
2 X number of Basement(s) and Plinth -
3 X number of Podiums -
4 Stilt Floor -
5 X number of Slabs of Super Structure -
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises -
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises -
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. -
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing -
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate -
11 Overall Percentage of Completion of the work done For the entire Building /Wing
7.5%

Bank Details

Bank Name
HDFC
Account Number
**********8365
Branch
HASMATHPET
Ifsc
HDFC0001378

Professional Information

Professional Name
DURGA DEVI UPPULURI
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
VASU DEVA RAO C
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Copy of the legal title report View -
Land Title Search Report from an advocate having experience of at least 10 years View -

Location

Mandal
Balanagar
Village
Olb Bowenpally
Locality
HAL COLONY
Street
ROAD NO 11
PIN Code
500011

Registration Status

16 Documents Uploaded
Full Details Available

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.