Project Information
Project Name
RAVICHANDRA INFRA
Project Type
Residential
Project Status
New Project
Authority Name
DTCP
Plan Approval No.
3003/W15/2021/2208
Proposed Completion
31 Mar 2024
Last Modified
29 Sep 2023
Promoter Information
Promoter Name
RAVICHANDRA INFRA
Promoter Type
Individual
Address
4-5-99, RAVICHANDRA INFRA, DOCTORS COLONY, MAHABUABABAD
Land Details
Survey No.
286/B/2/2/1,286/A/4,286/C/4/2,286/A/2/1,286/A/3/1,286/A/3/2,286/B/3/3/1,286/B/2/2/2,286/B/4/4/1,etc
Total Area
5,048.22
sq.m (54,339 sq.ft)
Net Area
5,048.22
sq.m (54,339 sq.ft)
Approved Built-up
14,164.60
sq.m (152,468 sq.ft)
Mortgage Area
1,095.23 sq.m
Total Building Units
1
Proposed Units
1
Property Boundaries
North
VACANT LAND
South
ROAD WIDTH-12
East
VACANT LAND
West
VACANT LAND
Uploaded Documents 11
Legal Title
Copy of the legal title report
Legal Title
Land Title Search Report from an advocate having experience of at least 10 years
Encumbrance
Details of encumbrances
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Document
Incase these documents are under preparation at time of registration, please ...
Declaration
Declaration in FORM B
Building Plan
Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Permit
Commencement Certificates for each building in each phase
Legal Entity
Status of Formation of Legal Entity
Completion
Form–1A Architects certificate Overall completion of registered project
Layout Plan
Local Authority Completion Certificate/Occupancy Certificate doc/Final Layou...
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.
Project Details
| Item | Proposed | Booked | Work Done (%) |
|---|---|---|---|
| Open Parking (In sqmts) | 3318 | - | - |
| Covered Parking ( In Numbers) | 90 | - | - |
Construction Progress
| # | Activity | Progress |
|---|---|---|
| 1 | Excavation |
|
| 2 | X number of Basement(s) and Plinth |
|
| 3 | X number of Podiums |
|
| 4 | Stilt Floor |
|
| 5 | X number of Slabs of Super Structure |
|
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
|
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
|
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
|
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
|
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | - |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing |
|
Bank Details
Bank Name
UNION BANK OF INDIA
Account Number
***********0003
Branch
MAHABUBABAD
Ifsc
UBIN0803677
Professional Information
Professional Name
BASANABOINA VAMSHIKRISHNA
Telanganarera Certificate No
NA
Professional Type
Structural Engineer
Professional Name
AYYAPPA SAMSANI
Telanganarera Certificate No
NA
Professional Type
Architect
Common Areas & Facilities
| Facility / Amenity | Available | Details |
|---|---|---|
| Internal Roads & Footpaths : | YES | COMPLETED |
| Water Supply : | YES | COMPLETED |
| Sewerage (Chamber, Lines, Septic Tank , STP) : | YES | COMPLETED |
| Storm Water Drains : | YES | INPROCESS |
| Green Strip/TOT LOT/Park : | No | NA |
| Street Lighting : | YES | COMPLETED |
| Community Buildings : | No | NA |
| Treatment And Disposal Of Sewage And Sullage Water : | YES | INPROCESS |
| Solid Waste Management And Disposal : | YES | INPROCESS |
| Water Conservation, Rain water Harvesting : | YES | INPROCESS |
| Energy management : | YES | INPROCESS |
| Fire Protection And Fire Safety Requirements : | YES | INPROCESS |
| Electrical Meter Room, Sub-Station, Receiving Station : | YES | INPROCESS |
| Aggregate area of recreational Open Space : | No | NA |
Registration Status
11 Documents Uploaded
Full Details Available
Need Complete Property Verification?
Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place
Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now
✨ Get comprehensive property verification in minutes