Commercial

MEENAKSHI PRIDE ROCK PHASE - III

MEENAKSHI INFRA STRUCTURES PRIVATE LIMITED
Gachibowli, NA, Gachi Bowli, Serilingampally, Ranga Reddy, PIN: 500032

Project Information

Project Name
MEENAKSHI PRIDE ROCK PHASE - III
Project Type
Commercial
Authority Name
GHMC
Plan Approval No.
53404/HO/WZ/CIR-11/2
Proposed Completion
18 Dec 2023
Last Modified
09 Aug 2021

Promoter Information

Promoter Name
MEENAKSHI INFRA STRUCTURES PRIVATE LIMITED
Promoter Type
Individual
Address
SY.NO 23, NA, GAC HIBOWLI VILLAGE, NA

Land Details

Survey No.
23 (p)
Total Area
22,253.35
sq.m (239,535 sq.ft)
Net Area
20,234.30
sq.m (217,802 sq.ft)
Approved Built-up
105,378.01
sq.m (1,134,289 sq.ft)
Road Widening Area
2,019.05 sq.m
Mortgage Area
11,455.41 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
PROPOSED 120FT WIDE ROAD
South
EXISTING LAND OF DIVIS AND 50FT WIDE ROAD
East
SY NO 47 OF GACHIBOWLI
West
LAND RETAINED BY OTHER OWNERS IN SY NO 23

Uploaded Documents 29

Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Legal Title Copy of the legal title report
Legal Title Land Title Search Report from an advocate having experience of at least 10 years
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Declaration Declaration in FORM B
Document Incase these documents are under preparation at time of registration, please ...
Building Permit Commencement Certificates for each building in each phase
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - 100%
Covered Parking ( In Numbers) 2500 - 100%

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums
100%
4 Stilt Floor
100%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
100%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
100%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
100%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
100%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
100%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
100%

Bank Details

Bank Name
HDFC
Account Number
**********7898
Branch
LAKDIKAPUL
Ifsc
HDFC0000021

Professional Information

Professional Name
VIJAYRAM CHAKRAPANI
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
KANCHHI HARI PRASAD
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : No NA
Water Supply : YES 100
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 100
Storm Water Drains : YES 100
Green Strip/TOT LOT/Park : YES 100
Street Lighting : YES 100
Community Buildings : No NA
Treatment And Disposal Of Sewage And Sullage Water : YES 100
Solid Waste Management And Disposal : No NA
Water Conservation, Rain water Harvesting : YES 100
Energy management : No NA
Fire Protection And Fire Safety Requirements : YES 100
Electrical Meter Room, Sub-Station, Receiving Station : YES 100
Aggregate area of recreational Open Space : No NA

Location

District
Mandal
Serilingampally
Village
Gachi Bowli
Locality
Gachibowli
Street
NA
PIN Code
500032

Registration Status

29 Documents Uploaded
Full Details Available

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.