Residential New Project

Mahalakshmis Astoria

MAHALAKSHMI HOMES
Bachupally, Bachupally, Bachupally, Bachupally, Medchal-Malkajgiri, PIN: 500090

Project Information

Project Name
Mahalakshmis Astoria
Project Type
Residential
Project Status
New Project
Authority Name
HMDA
Proposed Completion
31 Dec 2023
Last Modified
07 Jan 2022

Promoter Information

Promoter Name
MAHALAKSHMI HOMES
Promoter Type
Individual
Address
8-3-167/M/20/6/3/A & B/203, Madhura Heights, Rajeev Nagar, Rajeev Nagar

Land Details

Survey No.
144/A
Total Area
1,258.63
sq.m (13,548 sq.ft)
Net Area
953.39
sq.m (10,262 sq.ft)
Approved Built-up
2,340.25
sq.m (25,190 sq.ft)
Road Widening Area
305.24 sq.m
Mortgage Area
234.00 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
Land in Survey No 144 by Part
South
Land in Survey No 144 by Part
East
Land in Survey No 144 by Part
West
30 Feet Wide Road

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) 25 - 30%

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth -
3 X number of Podiums -
4 Stilt Floor
100%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
30%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises -
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. -
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing -
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate -
11 Overall Percentage of Completion of the work done For the entire Building /Wing
33%

Bank Details

Bank Name
AXIS BANK
Account Number
***********4439
Branch
MOTI NAGAR
Ifsc
UTID0001922

Professional Information

Professional Name
SYED ZAMEER HASAN
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
SYED SARFARAZ AAMER
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : No NA
Water Supply : YES Work Not Started
Sewerage (Chamber, Lines, Septic Tank , STP) : No NA
Storm Water Drains : No NA
Green Strip/TOT LOT/Park : No NA
Street Lighting : No NA
Community Buildings : No NA
Treatment And Disposal Of Sewage And Sullage Water : No NA
Solid Waste Management And Disposal : No NA
Water Conservation, Rain water Harvesting : YES Work Not Started
Energy management : No NA
Fire Protection And Fire Safety Requirements : No NA
Electrical Meter Room, Sub-Station, Receiving Station : YES Work Not Started
Aggregate area of recreational Open Space : No NA

Location

Mandal
Bachupally
Village
Bachupally
Locality
Bachupally
Street
Bachupally
PIN Code
500090

Registration Status

12 Documents Uploaded
Full Details Available

More by MAHALAKSHMI HOMES

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.