Project Information
Project Name
KALA HOMES
Project Type
Residential
Project Status
New Project
Authority Name
DTCP
Proposed Completion
05 Apr 2028
Last Modified
05 Oct 2024
Promoter Information
Promoter Name
AK CONSTRUCTIONS
Promoter Type
Individual
Address
5-10-8/2, 5-10-8/2, KISHANPUR, HANAMKONDA
Land Details
Survey No.
538 AND 536
Plot No.
1,50,51,52
Total Area
1,191.32
sq.m (12,823 sq.ft)
Net Area
930.35
sq.m (10,014 sq.ft)
Approved Built-up
2,643.25
sq.m (28,452 sq.ft)
Road Widening Area
260.97 sq.m
Mortgage Area
232.54 sq.m
Total Building Units
1
Proposed Units
1
Property Boundaries
North
18M EXISTING 30M PROPOSED ROAD
South
PLOT NO 49 9M WIDE ROAD
East
PLOT NO 1 2 AND 51
West
9M EXISTING 9M PROPOSED ROAD
Uploaded Documents 31
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Land Title Search Report from an advocate having experience of at least 10 years
Encumbrance
Details of encumbrances
Document
Incase these documents are under preparation at time of registration, please ...
Declaration
Declaration in FORM B
Resolution
Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Building Permit
Commencement Certificates for each building in each phase
Building Permit
Commencement Certificates for each building in each phase
Building Plan
Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan
Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Document
Incase these documents are under preparation at time of registration, please ...
Document
Incase these documents are under preparation at time of registration, please ...
Document
Incase these documents are under preparation at time of registration, please ...
Document
Incase these documents are under preparation at time of registration, please ...
Document
Incase these documents are under preparation at time of registration, please ...
Document
Incase these documents are under preparation at time of registration, please ...
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.
Project Details
| Item | Proposed | Booked | Work Done (%) |
|---|---|---|---|
| Open Parking (In sqmts) | 457 | - | 70% |
| Covered Parking ( In Numbers) | 20 | - | 70% |
Promoter / Land Owner / Investor Details 3
| Name | Type | Agreement |
|---|---|---|
| KORRA SARAIAH | Individual | AreaShare |
| BYRU JANARDHAN REDDY | Individual | AreaShare |
| CHIDURALA PURUSHOTHAM | Individual | AreaShare |
Construction Progress
| # | Activity | Progress |
|---|---|---|
| 1 | Excavation |
|
| 2 | X number of Basement(s) and Plinth |
|
| 3 | X number of Podiums |
|
| 4 | Stilt Floor |
|
| 5 | X number of Slabs of Super Structure |
|
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises |
|
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises |
|
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. |
|
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing |
|
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate |
|
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing |
|
Bank Details
Bank Name
INDIAN BANK
Account Number
******4132
Branch
GOPALPUR
Ifsc
IDIB000G133
Professional Information
Professional Name
M SRINIVASA RAO
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
K SHIVA SHANKER
Telanganarera Certificate No
NA
Professional Type
Structural Engineer
Common Areas & Facilities
| Facility / Amenity | Available | Details |
|---|---|---|
| Copy of Approval Layout Plan | View | - |
| Proforma of the allotment letter and agreement for sale | View | - |
| Proforma of the allotment letter and agreement for sale | View | - |
| Commencement Certificate/Copy of Building Permit/Proceedings | View | - |
| Copy of Sanctioned Building Plan | View | - |
Registration Status
31 Documents Uploaded
Full Details Available
Need Complete Property Verification?
Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place
Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now
✨ Get comprehensive property verification in minutes