Residential New Project

JYOTHI SERENITY

JYOTHI INFRATECH
YELLAREDDY GUDA, YELLAREDDY GUDA, Kapra, Medchal-Malkajgiri, PIN: 500062

Project Information

Project Name
JYOTHI SERENITY
Project Type
Residential
Project Status
New Project
Authority Name
GHMC
Proposed Completion
05 Dec 2026
Last Modified
28 Jan 2026

Promoter Information

Promoter Name
JYOTHI INFRATECH
Promoter Type
Individual
Address
1-4-160/144, SECOND FLOOR, PLOT NO. 144, B, OUT COLONY,SAINIKPURI, ROAD

Land Details

Survey No.
30 PART, 31 PART, 32 PART, 33PART, 34 PART, 35 PART, & 26
Plot No.
H.NO.1-2-96/2,PLOT NO. 1-2-96/2 AND PLOT NO.10
Total Area
4,180.56
sq.m (45,000 sq.ft)
Net Area
3,294.22
sq.m (35,459 sq.ft)
Approved Built-up
14,490.55
sq.m (155,976 sq.ft)
Road Widening Area
886.34 sq.m
Mortgage Area
1,098.35 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
PART OF VENDOR PREMISES NO 2-96 BY 2 AND PLOT NO 9
South
K SUBHADRAMMA AND OTHERS AND PLOT NO 11
East
ASHOK KUMAR LAND
West
EXISTING WIDE ROAD 30

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) 3970 - -
Covered Parking ( In Numbers) 100 - -

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums -
4 Stilt Floor
100%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
85%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
20%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
90%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
70%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
20%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
68.5%

Bank Details

Bank Name
DCB BANK
Account Number
**********0499
Branch
A S RAO NAGAR
Ifsc
DCBL0000051

Professional Information

Professional Name
K P SIVA
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
N VENKATA RAO
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : No NA
Water Supply : YES YET TO START
Sewerage (Chamber, Lines, Septic Tank , STP) : YES YET TO START
Storm Water Drains : YES YET TO START
Green Strip/TOT LOT/Park : No NA
Street Lighting : No NA
Community Buildings : No NA
Treatment And Disposal Of Sewage And Sullage Water : No NA
Solid Waste Management And Disposal : No NA
Water Conservation, Rain water Harvesting : YES YET TO START
Energy management : No NA
Fire Protection And Fire Safety Requirements : No NA
Electrical Meter Room, Sub-Station, Receiving Station : YES YET TO START
Aggregate area of recreational Open Space : No NA

Location

Mandal
Kapra
Locality
YELLAREDDY GUDA
Street
YELLAREDDY GUDA
PIN Code
500062

Registration Status

15 Documents Uploaded
Full Details Available

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.