Residential
New Project
GREATER INFRAS MARIGOLD
GREATER INFRA PROJECTS PRIVATE LIMITED
AMEENPUR, AMEENPUR, AMEENPUR, Sangareddy, PIN: 502032
Project Information
Project Name
GREATER INFRAS MARIGOLD
Project Type
Residential
Project Status
New Project
Authority Name
HMDA
Plan Approval No.
000592/BP/HMDA/0149/SKP/2025
Proposed Completion
28 Aug 2028
Last Modified
14 Feb 2026
Promoter Information
Promoter Name
GREATER INFRA PROJECTS PRIVATE LIMITED
Promoter Type
Individual
Address
217/A, 217/A, OPP METRO STATION, NEAR METRO STATION
Land Details
Survey No.
333
Plot No.
PLOT 129 AND 130
Total Area
493.72
sq.m (5,314 sq.ft)
Net Area
493.72
sq.m (5,314 sq.ft)
Approved Built-up
1,663.98
sq.m (17,911 sq.ft)
Road Widening Area
0.00 sq.m
Mortgage Area
141.13 sq.m
Total Building Units
1
Proposed Units
1
Property Boundaries
North
PLOT NO 128
South
PLOT NO 131
East
NEIGHBOURS LAND
West
30 FEET WIDE ROAD
Uploaded Documents 28
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Building Permit
Commencement Certificates for each building in each phase
Building Plan
Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Mortgage
Mortgage Deed
Agreement
Allotment Letter [as per the Format]
Agreement
Allotment Letter [as per the Format]
Declaration
Declaration in FORM B
Declaration
Declaration in FORM B
Encumbrance
Details of encumbrances
Encumbrance
Details of encumbrances
Resolution
Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Resolution
Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan
Letter of layout approval or Layout plan with a stamp of authority will also ...
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Legal Title
Copy of the legal title report
Agreement
DAGPA / MOU / Joint Development Agreement
Agreement
DAGPA / MOU / Joint Development Agreement
Building Permit
Commencement Certificates for each building in each phase
Building Permit
Commencement Certificates for each building in each phase
Document
Incase these documents are under preparation at time of registration, please ...
Document
Incase these documents are under preparation at time of registration, please ...
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.
Project Details
| Item | Proposed | Booked | Work Done (%) |
|---|---|---|---|
| Open Parking (In sqmts) | 269 | - | - |
| Covered Parking ( In Numbers) | 10 | - | - |
Promoter / Land Owner / Investor Details 3
| Name | Type | Agreement |
|---|---|---|
| BHARATHI RAJABABU MIKKILINENI | Individual | AreaShare |
| VIRIGINENI KALYANI | Individual | AreaShare |
| TANIKONDA VENKATA NARYANA | Individual | AreaShare |
Construction Progress
| # | Activity | Progress |
|---|---|---|
| 1 | Excavation |
|
| 2 | X number of Basement(s) and Plinth | - |
| 3 | X number of Podiums | - |
| 4 | Stilt Floor |
|
| 5 | X number of Slabs of Super Structure |
|
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | - |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | - |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | - |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | - |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | - |
| 11 | Overall Percentage of Completion of the work done For the entire Building /Wing |
|
Bank Details
Bank Name
UNION BANK OF INDIA
Account Number
***********0544
Branch
HYDERNAGAR
Ifsc
UBIN0562548
Professional Information
Professional Name
CH VV SATYANARAYANA
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
SYED MUKKARAM ALI
Telanganarera Certificate No
NA
Professional Type
Structural Engineer
Common Areas & Facilities
| Facility / Amenity | Available | Details |
|---|---|---|
| Copy of the legal title report | View | - |
| Copy of the legal title report | View | - |
| Details of encumbrances | View | - |
| Copy of Approval Layout Plan | View | - |
| Agreement of Sale (AOS) [as per the Format] | View | - |
| Declaration in FORM B | View | - |
| Commencement Certificate/Copy of Building Permit/Proceedings | View | - |
| Copy of Board Resolution for appointment of Authorized Signatory in case of other than individual | View | - |
| DAGPA / MOU / Joint Development Agreement | View | - |
| Allotment Letter [as per the Format] | View | - |
Registration Status
28 Documents Uploaded
Full Details Available
More by GREATER INFRA PROJEC...
Need Complete Property Verification?
Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place
Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now
✨ Get comprehensive property verification in minutes