Residential New Project

EDEN HOMES

ABODE VENTURES LLP
AHMEDGUDA VILLAGE, UNDER DAMMAIGUDA MUNICIPALITY, SURVEY NO 62/PART (AS PER REVENUE RECORD SURVEY NO 62A/2/A AND 62A/3), Ahmedguda, Keesara, Medchal-Malkajgiri, PIN: 501301

Project Information

Project Name
EDEN HOMES
Project Type
Residential
Project Status
New Project
Authority Name
HMDA
Plan Approval No.
046464/GHT/R1/U6/HMD
Proposed Completion
28 Oct 2027
Last Modified
22 May 2023

Promoter Information

Promoter Name
ABODE VENTURES LLP
Promoter Type
Individual
Address
4-96/40, KHAJAS ESTATE, KHAJAS ESTATE EDEN GARDEN, AHMEDGUDA

Land Details

Survey No.
SURVEY NO 62/PART (AS PER REVENUE RECORD SY NO 62A/2A/ AND 62A/3)
Total Area
6,069.90
sq.m (65,336 sq.ft)
Net Area
6,069.90
sq.m (65,336 sq.ft)
Approved Built-up
14,645.73
sq.m (157,647 sq.ft)
Mortgage Area
1,466.93 sq.m
Total Building Units
3
Proposed Units
3

Property Boundaries

North
LAND IN SURVEY NO 62 PART
South
40 FEET COMMON APPROACH ROAD
East
LAND IN SURVEY NO 62 AND 63
West
LAND IN SURVEY NO 62 PART

Uploaded Documents 33

Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Land Title Search Report from an advocate having experience of at least 10 years
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Encumbrance Details of encumbrances
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Declaration Declaration in FORM B
Building Permit Commencement Certificates for each building in each phase
Building Permit Commencement Certificates for each building in each phase
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Resolution Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Encumbrance Details of encumbrances
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) 4317 26 90%
Covered Parking ( In Numbers) 168 26 90%

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth
100%
3 X number of Podiums -
4 Stilt Floor
100%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
80%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
80%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
80%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
80%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
80%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
80%

Bank Details

Bank Name
HDFC
Account Number
**********9281
Branch
KUSHAIGUDA
Ifsc
HDFC0002023

Professional Information

Professional Name
BHARATH BHUSHAN REDDY
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
C LAKSHMI NARAYANA
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : No NA
Water Supply : YES HMWSSB
Sewerage (Chamber, Lines, Septic Tank , STP) : YES HMWSSB
Storm Water Drains : No NA
Green Strip/TOT LOT/Park : YES TOT LOT AND GREENERY
Street Lighting : No NA
Community Buildings : No NA
Treatment And Disposal Of Sewage And Sullage Water : No NA
Solid Waste Management And Disposal : No NA
Water Conservation, Rain water Harvesting : YES RWH PITS
Energy management : No NA
Fire Protection And Fire Safety Requirements : No NA
Electrical Meter Room, Sub-Station, Receiving Station : YES TSSPDCL
Aggregate area of recreational Open Space : No NA

Location

Mandal
Keesara
Village
Ahmedguda
Locality
AHMEDGUDA VILLAGE, UNDER DAMMAIGUDA MUNICIPALITY
Street
SURVEY NO 62/PART (AS PER REVENUE RECORD SURVEY NO 62A/2/A AND 62A/3)
PIN Code
501301

Registration Status

33 Documents Uploaded
Full Details Available

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.