Residential New Project

DPR VIPASSANA

DPR INFRA PROJECTS PRIVATE LIMITED
THATTIIANNARAM VILLAGE UNDER PEDDA AMBERPET MUNICIPALITY, JYOTHIPURAM, Thatti annaram, Abdullapurmet, Ranga Reddy, PIN: 500068

Project Information

Project Name
DPR VIPASSANA
Project Type
Residential
Project Status
New Project
Authority Name
HMDA
Proposed Completion
19 Dec 2025
Last Modified
10 Oct 2024

Promoter Information

Promoter Name
DPR INFRA PROJECTS PRIVATE LIMITED
Promoter Type
Individual
Address
2-3-581, PLOT NO 49, SHIV RESIDENCY, ROAD NO 1, SAI NAGAR COLONY, ROAD NO 1

Land Details

Survey No.
SY NO 107 NORTHERN SID, 112, 113 AND 114
Plot No.
PLOT NO 123
Total Area
418.03
sq.m (4,500 sq.ft)
Net Area
418.03
sq.m (4,500 sq.ft)
Approved Built-up
1,122.80
sq.m (12,086 sq.ft)
Mortgage Area
112.28 sq.m
Total Building Units
1
Proposed Units
1

Property Boundaries

North
PLOT NO 122
South
PLOT NO 124
East
40 FEET WIDE ROAD
West
PLOT NO 132

Uploaded Documents 33

Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Legal Title Copy of the legal title report
Building Permit Commencement Certificates for each building in each phase
Legal Title Land Title Search Report from an advocate having experience of at least 10 years
Encumbrance Details of encumbrances
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Document Incase these documents are under preparation at time of registration, please ...
Declaration Declaration in FORM B
Resolution Copy of Board Resolution for appointment of Authorized Signatory in case of o...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Layout Plan Letter of layout approval or Layout plan with a stamp of authority will also ...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Plan Floorwise building plan approval need not be uploaded. Only 1 page IOD Note/A...
Building Permit Commencement Certificates for each building in each phase
Building Permit Commencement Certificates for each building in each phase
These documents were uploaded by the promoter to TG-RERA. Click any document to view or download the PDF.

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) 224 1 100%
Covered Parking ( In Numbers) 10 1 100%

Construction Progress

# Activity Progress
1 Excavation
100%
2 X number of Basement(s) and Plinth -
3 X number of Podiums -
4 Stilt Floor
97%
5 X number of Slabs of Super Structure
100%
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
53%
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
45%
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
53%
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
35%
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
20%
11 Overall Percentage of Completion of the work done For the entire Building /Wing
50.3%

Bank Details

Bank Name
ICICI
Account Number
********1045
Branch
NAGOLE
Ifsc
ICIC0003886

Professional Information

Professional Name
BALASUBRAHMANYAM JALDA
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
JINKA SUNIL PRANAY
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Copy of Approval Layout Plan View -
Commencement Certificate/Copy of Building Permit/Proceedings View -
Copy of Sanctioned Building Plan View -

Location

District
Mandal
Abdullapurmet
Village
Thatti annaram
Locality
THATTIIANNARAM VILLAGE UNDER PEDDA AMBERPET MUNICIPALITY
Street
JYOTHIPURAM
PIN Code
500068

Registration Status

33 Documents Uploaded
Full Details Available

More by DPR INFRA PROJECTS P...

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.