Residential New Project

BRIGADE MANOR

Brigade Enterprises Limited
Ashok Marg, Father Nagar, Sanat Nagar, Survey No. 74/P, Ashok Marg, Father Nagar, Sanat Nagar, YERRAGADDA, Balanagar, Medchal-Malkajgiri, PIN: 500018

Project Information

Project Name
BRIGADE MANOR
Project Type
Residential
Project Status
New Project
Authority Name
GHMC
Plan Approval No.
2839/GHMC/SWBP/KHB1/2026
Proposed Completion
10 Feb 2029
Last Modified
14 Apr 2026

Promoter Information

Promoter Name
Brigade Enterprises Limited
Promoter Type
Individual
Address
78/AA and 79/AA, Marketing Office, Erragadda Road, Kalpataru Residency

Land Details

Survey No.
SY NO 74/P
Total Area
21,755.18
sq.m (234,173 sq.ft)
Net Area
19,370.64
sq.m (208,506 sq.ft)
Approved Built-up
41,331.43
sq.m (444,892 sq.ft)
Road Widening Area
2,384.54 sq.m
Mortgage Area
4,222.09 sq.m
Total Building Units
5
Proposed Units
5

Property Boundaries

North
Janapriyas Metropolis Apartment
South
Road
East
Janapriyas Metropolis Apartments
West
Road

Project Details

Item Proposed Booked Work Done (%)
Open Parking (In sqmts) - - -
Covered Parking ( In Numbers) 380 20 34%

Promoter / Land Owner / Investor Details 1

Name Type Agreement
Advait Enterprises Partnership RevenueShare

Construction Progress

# Activity Progress
1 Excavation -
2 X number of Basement(s) and Plinth -
3 X number of Podiums -
4 Stilt Floor -
5 X number of Slabs of Super Structure -
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises -
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises -
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. -
9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing -
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate -
11 Overall Percentage of Completion of the work done For the entire Building /Wing -

Bank Details

Bank Name
Kotak Mahindra Bank
Account Number
******8895
Branch
M G Road, Bangalore
Ifsc
KKBK0008066

Professional Information

Professional Name
Kaivaram Pandu Ranga Murthy
Telanganarera Certificate No
NA
Professional Type
Architect
Professional Name
B Jagadeesh Reddy
Telanganarera Certificate No
NA
Professional Type
Structural Engineer

Common Areas & Facilities

Facility / Amenity Available Details
Internal Roads & Footpaths : YES -
Water Supply : YES -
Sewerage (Chamber, Lines, Septic Tank , STP) : YES -
Storm Water Drains : YES -
Green Strip/TOT LOT/Park : YES -
Street Lighting : YES -
Community Buildings : YES -
Treatment And Disposal Of Sewage And Sullage Water : No NA
Solid Waste Management And Disposal : No NA
Water Conservation, Rain water Harvesting : YES -
Energy management : YES -
Fire Protection And Fire Safety Requirements : YES -
Electrical Meter Room, Sub-Station, Receiving Station : YES -
Aggregate area of recreational Open Space : YES -

Location

Mandal
Balanagar
Village
YERRAGADDA
Locality
Ashok Marg, Father Nagar, Sanat Nagar
Street
Survey No. 74/P, Ashok Marg, Father Nagar, Sanat Nagar
PIN Code
500018

Registration Status

19 Documents Uploaded
Full Details Available

More by Brigade Enterprises...

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.