TG-RERA Authority

Order Complaint No. 474 of 2022

14 Mar 2024
TG-RERA Authority
1 Pages

Order Details

Order Type TG-RERA Authority
Complaint/Case Number Complaint No. 474 of 2022
Year 2022
Order Category Regular Order
Order Date 14 Mar 2024
Complainant 3. Vikas Palavadi
Respondent Sri B. Sridhar Reddy
PDF Document Download PDF BU_030524114807331.pdf

Full Order Text

BEFORE TELANGANA STATE REAL ESTATE REGULATORY AUTHORITY
[Under the Real Estate (Regulation and Development) Act, 2016]
COMPLAINT NO.474 OF 2022
14th Day of March, 2024
Corum:

Dr. N. Satyanarayana, IAS (Retd.), Hon’ble Chairperson
Sri K. Srinivasa Rao, Hon’ble Member
Sri Laxmi Narayana Jannu, Hon’ble Member

1. Sri Pradeep Kumar Reddy
2. Meghanath Goud Soma
3. Vikas Palavadi

…Complainants
Versus

M/s Redwood Constructions
Represented by its Managing Partners
Sri B. Shashidhar Reddy &
Sri B. Sridhar Reddy

…Respondent

The present matter filed by the Complainants herein came up for hearing on
14.09.2023, 05.10.2023, 07.11.2023 and 19.12.2023 before this Authority in the
presence of Complainants in person and none appeared for the Respondent and
upon hearing the arguments, this Authority passes the following ORDER:
2.

The present Complaint has been filed by the Complainants under Section 31

of the Real Estate (Regulation & Development) Act, 2016 (hereinafter referred to as
the “Act”) read with Rule 34(1) of the Telangana Real Estate (Regulation and

1

Development) Rules, 2017 (hereinafter referred to as the “Rules”) requesting
appropriate action against the Respondent Builder.
A. Brief facts on behalf of the Complainants:

3.

The Complainants submit that they have purchased Flat Nos.503, 301 and

401 in the Project titled “PMR Heights” which is developed by the Respondent. The
Complainants

have

filed

their

respective

sale

deeds

being

Document

Nos.1622/2021, 5511/2020 and 5602/2020 to substantiate their claim. They
submitted that the said Project is registered with TS RERA vide Regn. No.
P02400001008 which expired on 31.03.2021 and that the construction of the said
Project is not in a good condition as mentioned below:
Common Issues:
i.

Lift: - Lift was installed on 01.11.2021 and within 7 months, the
Complainants have faced a major accident in which four members were
injured. That after checking with the technician, it was observed that
the lift is not of standard quality as opposed to the brochure. That the
Respondent Builder agreed to replace the lift, however failed to do so.

ii.

Water: - Till date, the Complainants did not receive GHMC Drinking
Water. Despite bringing this issue with the Respondent Builder, there is
no response from him. Complainants also submitted that till date, water
tanks not constructed properly in the Apartment. The Complainants are
purchasing water from outside water plants. That the Municipal Water
connection provided by the Respondent Builder is not sufficient for the
Complainants as the Respondent Builder has taken on 3/4th inch water
pipe connection from GHMC.

iii.

Apartment Safety grills: Till date safety grills are not affixed in the
Apartment.

iv.

Duct Area: - Till date duct area is not closed.

v.

Intercom Facility: - Intercom telephone facility has not been provided in
the Apartment. As soon as possible it needs to be ready.

2

Flat wise issues:
Flat No: 503:
vi.

Kitchen sink broken within 6 months.

vii.

The quality of the toilet doors is very poor.

viii.

Within 9 months walls are getting cracks in and outside.
Flat No: 301

ix.

Floor tiles are broken due to the improper grouting at the installation
time, sometimes tiles are shaking while walking on the floor.

x.

Water is staying in the Master Bedroom Bathroom due to the slope
issue.

xi.

Within 3 months wall in Common Bathroom is damped due to the
drainage pipe issue in the above flat.

xii.

Window safety grill not yet installed in the master bedroom.

xiii.

As per the brochure, teak wood door frames have to be installed.
However, door frames are not of teak wood and all are getting cracked.

xiv.

Door frames painting (Second coat pending) not done properly.

xv.

Bathroom Ventilator Window gaps need to be closed with the silicon.

xvi.

Walls build quality was not good, while the first cote cement if gone,
sand is falling if touched finger on the wall.

xvii.

Common area Lighting: In the corridor, there is no common bulb point
fixed.

xviii.

Rainwater getting into flat due to the improper coverage in the corridor.

xix.

Main door polish not done till date.

xx.

Either Builder or landowner has to pay the property tax at the
construction time, still it is pending.
Flat No: 401

xxi.

Manjeera water supply.

xxii.

Tiles Broken.

xxiii.

Walls had cracks in all the rooms.

xxiv.

The flat has not been handed over and the Respondent is asking to pay
the property tax from our end from the year 2019.

3

4.

Accordingly, the Complainants sought for the following reliefs:
Common Issues:
i.

Need to replace existing lift with a standard Lift.

ii.

Municipal water connection pipe size must be increased from 3 / 4th
inch size to 1 inch size and the water tanks has to be provided without
leakages.

iii.

Apartment Safety grills to be installed.

iv.

Duct area to be closed.

v.

Intercom Facility to be provided.
Flat No: 503: -

vi.

Builder must replace the kitchen sink.

vii.

Replace the toilet doors.

viii.

Wall cracks must be closed.
Flat No: 301

ix.

Broken tiles to be replaced and grouting to be done in the entire flat.

x.

Master Bedroom Bathroom floor tiles need to be replaced as per the
water flow.

xi.

Common Bathroom wall dampness to be fixed.

xii.

Window grill need to be installed at Master bedroom.

xiii.

All door frames got cracked. Need to replace.

xiv.

Need to paint all the door frames.

xv.

Bathroom Ventilator Windows gaps need to be closed with the silicon
gum.

xvi.

Common bulb point need to fix Infront of the door in the corridor.

xvii.

Need to Polish the Main door.

xviii.

Either Builder or landowner must pay the property tax at the time of
construction.
Flat No: 401

xix.

Manjeera water supply to be given.

xx.

Need to replace broken tiles

xxi.

Cracks need to be closed with the crack filling.

xxii.

Property tax has to be paid by the Landlord or else the Builder.

4

B. Observations and Directions of the Authority:
5.

Respondents have appeared after issuance of notice, but failed to file counter

or represent/plead their case. As such, the Respondents have been set ex-parte on
07.11.2023.
6.

It is observed that the Project is registered with this Authority vide Regn. No.

P02400001008 with completion date on

31.03.2021. On 19.12.2023, the

Complainants were present and reiterated the contents of the Complaint and
submitted that the Respondent has completed some works such as closing duct
area, municipal water connection and safety grills provided. They submitted that
remaining issues are still pending, amongst which lift is a major issue causing
severe inconvenience to the residents. Further, the association had not yet been
formed.
7.

Admittedly, the Complainants, as per their respective Sale Deeds have

occupied the flats in December 2020. As per Section 14(3), which stipulates that “In
case any structural defect or any other defect in workmanship, quality or provision of
services or any other obligations of the promoter as per the agreement for sale
relating to such development is brought to the notice of the promoter within a period
of five years by the allottee from the date of handing over possession, it shall be the
duty of the promoter to rectify such defects without further charge, within thirty days,
and in the event of promoter's failure to rectify such defects within such time, the
aggrieved allottees shall be entitled to receive appropriate compensation in the
manner as provided under this Act. Such period, in the present case, expires by
December 2025, and thereby, considering the facts and circumstances, following
directions are issued to the Respondent:

5

a. As the Complainants have submitted that lift was installed on 01.11.2021
and within 7 months, the Complainants have faced a major accident in
which four members were injured, the Respondent is directed to install lift of
standard company within 60 days;
b. Quantity of water should suffice the occupancy of the Building as per the
standards i.e., 150 litres per person and it should be calculated accordingly.
In case, the quantity supplied is insufficient, the Respondent is directed to
apply for a required connection. Similarly, if the capacity of the overhead
tank/sump

is

insufficient,

the

Respondent

is

directed

to

provide

supplementary tank.
c. With respect to Flat No.401, after execution of the sale deed, the purchaser
has to approach the GHMC for assessment of property tax and the same has
to be paid by the respective flat owner only.
8.

In lieu of the above-mentioned directions, the present complaint stands

disposed of. Upon the failure of the Respondent Builder to comply with the present
Order, appropriate action, including imposition of penalty, will be taken as per
provisions under Section 63 of the Act, 2016.
9.

If aggrieved by this Order, the parties may approach the TS Real Estate

Appellate Tribunal (vide G.O.Ms.No.8, Dt.11-01-2018, the Telangana State Value
Added Tax Appellate Tribunal has been designated as TS Real Estate Appellate
Tribunal to manage the affairs under the Act till the regular Tribunal is established)
as per Section 44 of the Act, 2016.
Sd/Sri K. Srinivasa Rao,
Hon'ble Member,
TS RERA

Sd/Sri Laxmi Narayana Jannu,
Hon'ble Member,
TS RERA

Sd/Dr. N. Satyanarayana, IAS (Retd.),
Hon'ble Chairperson,
TS RERA

6

Related Orders

Interim Order Complaint No.228 of 2025
Rangareddy, Telangana, 500077)
15 Apr 2026
Order Complaint No. 386 of 2025
Koti, Hyderabad-500027.
09 Apr 2026
Order Complaint No. 153 of 2024
Telangana – 500011.
08 Apr 2026
Order Complaint No. 152 of 2024
Telangana – 500011.
08 Apr 2026
Order Complaint No. 151 of 2024
Telangana – 500011.
08 Apr 2026

Need Complete Property Verification?

Get ownership details, EC records, survey sketch, zone checks, geo-insights & AI analysis - all in one place

Ownership Details
EC Records
Survey Sketch
Zone Checks
Geo-Insights
AI Analysis
Try VerifyMyLand Now ✨ Get comprehensive property verification in minutes

Verify Your Property Before You Buy

AI-powered legal due diligence — title verification, encumbrance checks, zoning compliance, and risk assessment in minutes. Catch issues before they cost you crores.